Thurrock Flexible Generation

Plans & progress

Proposals and reports

DCO documents

Non material change 2024

DCO Consent

Material Change Request

Examination Documents

Pre-Examination Documents

Notice relating to postponement of Part 2 of the Preliminary Meeting and request for further information

Plans

A2.1 Location and Order Limits Plans 13.11.20

A2.2 Land Plans and Special Category Land Plans 29.10.20

A2.3 Works Plan 09.11.20

A2.4 Access Rights of Way and Traffic Regulation Measures Plans 13.11.20

A2.5 Illustrative Highway Engineering Drawings 13.11.20

A2.6 Illustrative General Arrangement Plans 13.11.20

A2.7 Illustrative Site Layout Plans 13.11.20

A2.9 Illustrative Landscape Plan 13.11.20

A2.10 Concept Drainage Plan 04.11.20

A2.11 Historic or Scheduled Monument Sites Plan 13.11.20

A2.12 Statutory Nature Conservation Sites 13.12.20

A2.13 Tree Preservation Order and Hedgerow Plan 13.11.20

A.14 Deemed Marine License Co-Ordinate Plan 13.11.20

Documents

A3.1 Draft Development Consent Order

A3.2 Explanatory Memorandum Version 2 December 2020

A4.3 Book of Reference 29.10.20

A4.3 Book of Reference tracked 29.10.20

A5.2 Habitats Regulations Assessment Report 11.12.20

A5.2 Habitats Regulations Assessment Tracked 11.12.20

A6 Vol2 Chapter 2 Project Description 13.11.20

A6 Vol3 Onshore Ecology 11.12.2020

A6 Vol3 Onshore Ecology Tracked 11.12.202

A6 Vol3 Chapter 15 Hydrology and Flood Risk 26.11.20

A6 Vol3 Chapter 15 Hydrology and Flood Risk Tracked 26.11.20

A6 Vol3 Chapter 17 Marine Environment 08.12.20

A6 Vol3 Chapter 17 Marine Environment Tracked 08.12.20

A6 Vol5 Chapter 33 Summary of Residual Effects 13.11.20

A6 Vol5 Chapter33 Summary of Residual Effects Tracked 13.11.20

A6 Vol6 Appendix 2.1 Mitigation Enhancement and Monitoring Commitments 13.11.20

A6 Vol6 Appendix 2.1 Mitigation Enhancement and Monitoring Commitments Tracked 13.11.2

A6 Vol6 Appendix 9.3 Biodiversity and Net Gain Assessment 11.12.20

A6 Vol6 Appendix 9.3 Biodiversity and Net Gain Assessment Tracked 11.12.20

A6 Vol6 Appendix 9.4 Foreshore Wintering Bird Surveys 2019-2020 23.11.20

A6 Vol6 Appendix 9.4 Foreshore Wintering Bird Surveys Tracked 2019-2020 23.11.20

A6 Vol6 Appendix 17.3 Water Framework Directive Assessment 13.11.20

A6 Vol6 Appendix 17.3 Water Framework Directive Assessment Tracked 13.11.20

A6 Vol6 Appendix 15 FRA 26.11.20

A6 Vol6 Appendix 15 FRA Tracked 26.11.20

Conceptual Drainage Strategy

A8.5 Flood Evacuation Plan 26.11.20

A8.5 Flood Evacuation Plan Tracked26.11.20

A8.7 Outline Ecological Management Plan 07.12.20

A8.7 Outline Ecological Management Plan Tracked 07.12.20

A8.8 Outline Construction Traffic Management Plan 13.11.20

A8.8 Outline Construction Traffic Management Plan Tracked 13.11.20

Thurrock FGP Table of DCO Amends to Version 03.12.20

Thurrock Flexible Generation Plant Causeway Public Access Restrictions 1

Thrrock Flexible Generation Plan Causeway Decommissioning ES Addendum

Thurrock Flexible Generation PLan Further Heritage Settings Assessment 07.12.20

Thurrock Flexible Generation Plan Navigation Risk Assessment 1

Thurrock Flexible Generation Plant Updated Heritage Baseline Report 14.12.20

Track Change DCO Version 02.07.20 to Version 03.12.20

Track Changes Explanatory Memorandum Version 01.05.20 to Version 02.12.20

Cover Letters

EN010092 Thurrock Power Procedural Deadline C Letter

EN010092 Thurrock Power Heritage Letter Procedural Deadline C

Post-Acceptance Documents

Application Documents

A1.4 Application Form

A1.5 Copies of Newspaper Notices

A2.1 Location and Order Limits Plans

A2.2 Land Plans and Special Category Land Plans

A2.3 Works Plans

A2.4 Access Rights of Way and Traffic Regulation Measures Plans

A2.5 Illustrative Highway Engineering Drawings

A2.6 Illustrative General Arrangement Plans

A2.7 Illustrative Site Layout Plans

A2.8 Illustrative Cross Section Plans

A2.9 Illustrative Landscape Plan

A2.10 Concept Drainage Plan

A2.11 Historic or Scheduled Monument Sites Plan

A2.12 Statutory and Non-Statutory Nature Conservation Sites

A2.13 Tree Preservation Order and Hedgerow Plan

A2.14 Deemed Marine License Co-ordinate Plan

A3.1 Draft Development Consent Order

A3.2 Explanatory Memorandum

A3.3 Validation Report

A4.1 Funding Statement

A4.2 Statement of Reasons

A4.3 Book of Reference

A5.1 Consultation Report

A5.1.1 Consultation Report Appendix 1: Early Non-Statutory Consultation

A5.1.2 Consultation Report Appendix 2: Statement of Community Consultation

A5.1.3 Consultation Report Appendix 3: Consultation Scoping

A5.1.4 Consultation Report Appendix 4: Section 42 Planning Act 2008 (Statutory and Non-Statutory Consultees) Consultation 2018

A5.1.5 Consultation Report Appendix 5: Section 47 Planning Act 2008 (Local Community) Consultation 2018

A5.1.6 Consultation Report Appendix 6: Section 48 Planning Act 2008 (Wider Community) Consultation 2018

5.1.7 Consultation Report Appendix 7: Consultation on Project Changes 2019

A5.1.8 Consultation Report Appendix 8, Part 1: Consultation Responses and Continuing Consultation

A5.1.8 Consultation Report Appendix 8, Part 2: Consultation Responses and Continuing Consultation

A5.1.8 Consultation Report Appendix 8, Part 3: Consultation Responses and Continuing Consultation

A5.1.8 Consultation Report Appendix 8, Part 4: Consultation Responses and Continuing Consultation

A5.1.8 Consultation Report Appendix 8, Part 5: Consultation Responses and Continuing Consultation

A5.1.8 Consultation Report Appendix 8, Part 6: Consultation Responses and Continuing Consultation

A5.2 Habitats Regulations Assessment Report

Environmental Statement

A6.0.1 Environmental Statement Contents Page

A6.0.2 Glossary, Acronyms, Units

A6 Volume 1: Non-Technical Summary

A6 Volume 2, Chapter 1: Introduction

A6 Volume 2, Chapter 2: Project Description

A6 Volume 2, Chapter 3: Alternatives

A6 Volume 2, Chapter4: Methodology

A6 Volume 2, Chapter 5: Scoping

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 1

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 2

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 3

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 4

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 5

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 6

A6 Volume 3, Chapter 6: Landscape and Visual Resources Part 7

A6 Volume 3, Chapter 7: Historic Environment

A6 Volume 3, Chapter 8: Land Use, Agriculture and Socio-Economics

A6 Volume 3, Chapter 9: Onshore Ecology

A6 Volume 3, Chapter 10: Traffic and Transport

A6 Volume 3, Chapter 11: Noise and Vibration

A6 Volume 3, Chapter 12: Air Quality

A6 Volume 3, Chapter 13: Human Health

A6 Volume 3, Chapter 14: Climate Change

A6 Volume 3, Chapter 15: Hydrology and Flood Risk

A6 Volume 3, Chapter 16: Geology, Hydrogeology and Ground Conditions

A6 Volume 3, Chapter 17: Marine Environment

A6 Volume 4, Chapter 18: Cumulative Effects Assessment (‘CEA’) Introduction and Screening

A6 Volume 4, Chapter 19: Landscape and Visual Resources CEA

A6 Volume 4, Chapter 20: Historic Environment CEA

A6 Volume 4, Chapter 21: Land Use, Agriculture and Socio-Economics CEA

A6 Volume 4, Chapter 22: Onshore Ecology CEA

A6 Volume 4, Chapter 23: Traffic and Transport CEA

A6 Volume 4, Chapter 24: Noise and Vibration CEA

A6 Volume 4, Chapter 25: Air Quality CEA

A6 Volume 4, Chapter 26: Human Health CEA

A6 Volume 4, Chapter 27: Climate Change CEA

A6 Volume 4, Chapter 28: Hydrology CEA

A6 Volume 4, Chapter 29: Geology, Hydrogeology and Ground Conditions CEA

A6 Volume 4, Chapter 30: Marine Environment CEA

A6 Volume 5, Chapter 31: Summary of Inter-Related Effects

A6 Volume 5, Chapter 32: Summary of Cumulative Effects

A6 Volume 5, Chapter 33: Summary of Residual Effects

A6 Volume 6, Appendix 2.1: Mitigation, Enhancement and Monitoring Commitments

A6 Volume 6, Appendix 2.2: Accident and Emergency Management

A6 Volume 6, Appendix 4.1: Transboundary Impacts Screening

A6 Volume 6, Appendix 7.1: Historic Environment Desk-Based Assessment

A6 Volume 6, Appendix 7.2: Geoarchaeological Deposit Model Report

A6 Volume 6, Appendix 8.1: Published ALC Information and ALC Site Survey Results

A6 Volume 6, Appendix 8.2: Common Land

A6 Volume 6, Appendix 8.3: Construction Labour Forecasting

A6 Volume 6, Appendix 9.1: Ecological Desk Study and Surveys

A6 Volume 6, Appendix 9.2: Third Party Survey Reports

A6 Volume 6, Appendix 9.3: Biodiversity Net Gain Assessment

A6 Volume 6, Appendix 9.4: Foreshore Wintering Bird Surveys 2019-2020

A6 Volume 6, Appendix 10.1: Transport Assessment

A6 Volume 6, Appendix 11.1: Baseline Sound Monitoring Report

A6 Volume 6, Appendix 11.2: BS4142-2014 Statements of Competence

A6 Volume 6, Appendix 11.3: Construction Noise Assessment

A6 Volume 6, Appendix 11.4: Operational Noise Assessment Methodology and Results

A6 Volume 6, Appendix 11.5: Noise Standards and Guidance

A6 Volume 6, Appendix 12.1: Air Quality Impacts on Ecological Receptors

A6 Volume 6, Appendix 12.2: Air Quality Baseline

A6 Volume 6, Appendix 12.3: Stack Height Determination

A6 Volume 6, Appendix 12.4: Model Inputs and Outputs

A6 Volume 6, Appendix 12.5: Results of Other Scenarios

A6 Volume 6, Appendix 12.6: Assessment of Traffic-Related Emissions

A6 Volume 6, Appendix 12.7: Assessment of Plume Visibility

A6 Volume 6, Appendix 12.8: Further Analysis of Air Quality in Gravesend

A6 Volume 6, Appendix 13.1: Health Baseline

A6 Volume 6, Appendix 14.1: GHG Calculations

A6 Volume 6, Appendix 14.2: Climate Change Risk

A6 Volume 6, Appendix 15.1: Flood Risk Assessment

A6 Volume 6, Appendix 15.2: Flood Zones and Model Data Part 1

A6 Volume 6, Appendix 15.2: Flood Zones and Model Data Part 2

A6 Volume 6, Appendix 15.3: Abstractions, Discharges and Pollution Incidents

A6 Volume 6, Appendix 16.1: Phase 1 Preliminary Risk Assessment

A6 Volume 6, Appendix 16.2: Phase 2 Site Investigation Report

A6 Volume 6, Appendix 16.3: Team 2100 Tilbury Ground Investigations

A6 Volume 6, Appendix 17.1: Phase 1 Intertidal Survey Report and Benthic Ecology Desktop Review

A6 Volume 6, Appendix 17.2: Hydrodynamic Modelling and Sediment Assessment

A6 Volume 6, Appendix 17.3: Water Framework Directive Assessment

A6 Volume 6, Appendix 17.4: Third Party Survey Reports

A7.1 Statutory Nuisance Statement

A7.2 Grid and Gas Connection Statement

A7.3 Conceptual Drainage Strategy

A7.4 Gas Connection Concept Design Report

A7.5 CHP Report

A7.6 Carbon Capture Readiness Report

A7.7 Other Consents and Licenses Statement

A7.8 Concept Design of Causeway for Delivery of Abnormal Indivisible Loads

A8.1 Arboriculture Impact Assessment Part 1

A8.1 Arboriculture Impact Assessment Part 2

A8.1 Arboriculture Impact Assessment Part 3

A8.2 Scoping Opinion and Scoping Report

A8.3 Statement of Case and Green Belt Statement Part 1

A8.3 Statement of Case and Green Belt Statement Part 2

A8.3 Statement of Case and Green Belt Statement Part 3

A8.3 Statement of Case and Green Belt Statement Part 4

A8.3 Statement of Case and Green Belt Statement Part 5

A8.4 Design Principles Statement

A8.5 Flood Evacuation Plan

A8.6 Outline Code of Construction Practice

A8.7 Outline Ecological Management Plan

A8.8 Outline Construction Traffic Management Plan

A8.9 Outline Construction Worker Travel Plan

A8.10 Outline Saltmarsh Enhancement and Maintenance Plan

A8.11 Outline Written Scheme of Archaeological Investigation

A8.12 National Grid Statement of Common Ground

Consultation Documents

Preliminary Environmental Impact Report

More detail about the project and its potential impacts is included in the Preliminary Environmental Impact Report and Habitats Regulation Assessment reports below

Contents Page

Glossary Acronyms Units

Volume One

Non Technical Summary

Volume Two

Chapter 1 Introduction

Chapter 2 Project Description

Chapter 3 Alternatives

Chapter 4 Methodology

Chapter 5 Scoping and Consultation

Volume Three

Chapter 6 Landscape and Visual Resources

Chapter 7 Historic Environment

Chapter 8 Land Use Agriculture and Socio-economics

Chapter 9 Ecology

Chapter 10 Traffic and Transport

Chapter 11 Noise and Vibration

Chapter 12 Air Quality

Chapter 13 Human Health

Chapter 14 Climate Change

Chapter 15 Hydrology and Flood Risk

Chapter 16 Geology Hydrogeology and Ground Conditions

Volume Four

Chapter 17 Summary of Inter Related Effects

Chapter 18 Summary of Cumulative Effects

Chapter 19 Summary of Residual Effects

Volume Five

Appendix 2.1 Enhancement Mitigation Monitoring Committments

Appendix 2.2 Code of Construction Practice

Appendix 2.3 Accident and Emergency Management

Appendix 2.3 Accident and Emergency Management

Appendix 4.1 Cumulative Developments and Screening

Appendix 4.2 Transboundary Impacts Screening Note

Volume Six

Appendix 6.1 Addendum to the Assessment of Landscape and Visual Resources

Appendix 7.1 Historic Environment Desk Based Assessment

Appendix 7.2 Geophysical Survey

Appendix 8.1 ALC published data

Appendix 9.1 Ecological Desk Study and Surveys

Appendix 9.2 Outline Ecological Management Plan

Appendix 10.1 Transport Assessment

Appendix 11.1 Baseline Sound Monitoring Report

Appendix 11.2 BS4142 Statements

Appendix 11.3 Construction Noise Assessment Methodology and Results

Appendix 11.4 Operational Noise Assessment Methodology and Results

Appendix 11.5 Standards and Guidance Relevant to Noise and Vibration

Appendix 12.1 Air Quality Impacts on Ecological Receptors

Appendix 12.2 AQ Baseline

Appendix 12.3 Stack Height Determination

Appendix 12.4 Model Inputs and Outputs

Appendix 12.5 Results of Other Scenarios

Appendix 13.1 Health Baseline

Appendix 14.1 GHG Calculations

Appenidx 15.1 Flood Risk Assessment

Appendix 15.2 Flood Zones and Model Data

Appendix 15.3 Surface Water Abstraction Licenses Discharge Consents and Pollution Incidents

Appendix 16.1 Preliminary Risk Assessment

Habitats Regulations

Habitats Regulation Assessment Report

Second Consultation – Autumn 2019

Subsequent to the first round of consultation in October 2018/2019, certain changes were made to the design of the proposed project as a result of feedback received to the first consultation, discussions with stakeholders and ongoing design refinement. Consultation on these project changes will take place during the period from 11th October 2019 to 11th November 2019. All feedback should be received by Monday 11th November 2019 to ensure that it is considered. Feedback will help to shape the final design of the project

Project Changes Report Oct 2019

Produced in October 2019. This document summarises technical design changes made to the project subsequent to the first round of consultation

Zone Plan Oct 2018

This plan shows the zones within the proposed development as at October 2018 and was included in the Have your Say Document produced in October 2018

Zone Plan October 2019

Shows the zones within the proposed development at October 2019, and reflects design changes which have taken place since October 2018

Change Plan Oct 2019

Detailed annotated plan to show the project changes since October 2018

DCO Boundary Oct 2019

Plan showing the revised project boundary, taking into account project changes since October 2018

Common Land Application

NMC Application Documents